Project: dhhVolksplane   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:david hawley   -  
Project:   Volksplane VP-1   -   VIEW REPORTS
Total Hours:84
Total Flight Time:3
Total Expense:$6192.70
Start/Last Date:Nov 16, 2018 - No Finish Date
Engine:Volkswagon
 
Friendly URL: https://eaabuilderslog.org?s=dhhVolksplane

Home or Last Project Picture

Dec 29, 2019     Fuselage, beginnings       Category: Fuselage
Exchanged more emails with Fritz W. When I laid the longerons on the workbench I could see that connecting the cockpit bulkheard to the rear sternpost becomes a “narrowing” both bottom and sides. My question was is the bottom “curved or straight”? He replied that a gradual curve is preferable so not to make the VP into a “pregnant Guppy” shape.In these pictures I placed the right hand fuselage longerons on the workbench with blocks and the vertical risers approximately in place.After placing these in place "dry" (no glue) I realized I needed to use shorter blocks so the gussets and skin would be above the blocks.I replaced any oversize blocks with 1/2 inch thick blocks.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.